The annual City street resurfacing project has started with milling (grinding the surface of the existing asphalt pavement), patching, and concrete curb replacements in various locations throughout the City to prepare them to be re-paved with asphalt. The work should be completed by late summer or early fall. Please travel cautiously near these construction operations.
To see what streets will be resurfaced this year (and in past years) check out this interactive map created by our stellar GIS staff: bit.ly/3PepcmH