Frequently Asked Questions
Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.
Engineering
10-
Engineering
The City of Liberty design criteria and technical specifications can be found our our Engineering Division's webpage. Any questions regarding the Design Criteria and Technical Specifications or about public works projects or this process should be directed to the Engineering Division at 816.439.4503.
-
Engineering
A public improvement permit application may be submitted to the office of the City Engineer. The Public Improvement Permit application requires that an associated Performance and Maintenance Bond accompany the application.
-
A permit must be obtained prior to any work performed in the right-of-way. This work may include, but is not limited to, replacing a sidewalk, curb, driveway, driveway culvert, plumbing or other repairs.Engineering
-
The fee for permit and inspection of right-of-way work is $45.00 and is issued through the office of the City Engineer; the permit shall expire after 60 days from the date of issuance. Allow at least 24 hours for permit processing. All persons and entities maintaining, constructing, or installing facilities are required to maintain an up-to-date City Occupational License and up-to-date Liability Insurance conforming to the requirements as detailed in the City Right-of-Way Ordinance passed 1-25-2010. If you are the resident property owner conducting the work yourself, you do not need a City occupational License.Engineering
-
Engineering
Any Person with a Right-of-Way Permit is authorized to use Street Plate Bridging (SPB) to cover open excavations, prior to backfill and restoring the street surface suitable for public use; embedded SPB are required during the months of December through February. SPB shall be marked with the owner’s name and telephone number. A City SPB permit must be obtained for a fee as part of a right-of-way permit application.
-
Engineering
Yes. Contractors installing an irrigation system in the public right of way must obtain an occupation license in the City of Liberty and apply for both a building permit (lawn sprinkler system permit) and a right-of-way permit. By City ordinance, a Release and Indemnification waiver needs to be signed and notarized by each person on the deed prior to applying for an irrigation permit. Backflow devices must be inspected by the City. More information on irrigation permit procedures is available by calling the Engineering Division at 816.439.4503.
-
Engineering
Contact DIG RITE at 1.800.344.7483 and the City of Liberty Water & Sewer Division at 816.439.4503 for utility line locations to ensure the utilities are marked so than an appropriate distance may be maintained during excavation for the safety of all. Both of these parties will need three working days notification prior to digging.
-
Engineering
Floodplain development in the City of Liberty must conform to Section 30-100 of the City Unified Development Ordinance and is subject to review by the City Engineer. For developments within a 100-year floodplain, a City Floodplain Development Permit is required.
-
Engineering
Many people believe federal disaster assistance will come to their aid after a flood. Floods are not always declared a federal disaster. Even when they are, aid is usually in the form of a loan that must be paid back with interest. Flood insurance, on the other hand, pays for all covered losses, and unlike loans, that money doesn’t have to be paid back. Find out more about flood insurance on FEMA's website, or by contacting your insurance agent. For more information on obtaining copies of flood maps, how to read them, and to request map changes that may be warranted, check out FEMA's website or contact the Engineering Division at 816.439.4503.
-
Engineering
To request a change in public parking, such as "no parking" or restricted parking signage, a Parking Regulation Petition must be completed and returned to the office of the City Engineer. The petition must be completed and signatures obtained by 75% of the residents in the adjacent area of the request. For a better description of the area required for a petition request, you may contact the City engineer’s office for a map of the required signatures before submitting the petition to the city. If you have questions about parking or regulations or the petition process, please contact Engineering at 816.439.4503.